freediver wrote on Sep 8
th, 2026 at 7:29am:
How much would it cost to safely run a nuclear powered boat?
You aren't exactly the first to think of it. The Navy runs plenty of them.
Can't think of any civilian boats running on nuclear so yes military have been doing it for a long time.
Russian Sub Kursk blew itself up yet no danger from nuclear reactor onboard.
When it comes in Lloyds, Veritas and American Bureau of Shipping (ABS) and ISO standards will have their say in safety aspects with design.
Since this 1MW reactor fits on a ute we can say it probably weighs less than 1 ton which is common payload.
This also makes it viable for business electric planes carrying up to 10 passengers maybe they can carry more because fuel load doesn't exist to impact maximum take off weight.With full fuel sometimes they have to limit passenger weight.
This isn't viable with batteries due to weight and limited range.
Be able to travel around the world non stop no refuelling for 5 years.
I can see multiple uses for that 1MW reactor.
Blackout Bowen proposed offshore wind for NSW.
Quote:The UK's flagship floating wind project off the coast of Cornwall has collapsed, with developer Hexicon selling the site this week for just £1.
The failure highlights the risks and frailties of experimental renewables technology. It also exposes the limits of efforts to make renewable energy economically bulletproof.
The TwinHub project made history in 2022 by winning the UK's first 'Contract for Difference' for a floating wind scheme, securing a 15-year guaranteed price deal from the government at £87.30 per MWh.
The 32MW scheme in the Celtic Sea was designed around Hexicon's multi-turbine, semi-submersible foundation concept. The Celtic Sea lies off the southern coast of Ireland, touching parts of Wales, Cornwall, Devon, and Brittany.
The project relied on a strategic partnership formed in March 2021 between American engineering firm Bechtel and Swedish floating wind developer Hexicon.
However, soaring inflation, supply chain bottlenecks, and severe cost overruns scuppered the project, leading to the cancellation of its state-backed power contract.
Hexicon then divested its entire 100% stake in the project company—including all assets and liabilities—for just £1.
https://x.com/PeterDClack/status/2085289910421037220